The
additions to this central Toronto home were done
in three stages. The first involved a large rear
addition comprised of a family room, kitchen,
eating area, new side entrance and powder room.
The addition to the 2nd floor enlarged an existing
small bedroom. The bay windows with transoms compliment
the existing windows on the front elevation of
the house.
The
2nd phase involved gutting the interior of the
3rd floor and constructing a new dormer on the
front elevation and two new dormers on the rear.
A new bathroom occupies the front dormer while
the rear dormers provide much needed floor area
and light to the bedrooms.
The 3rd phase saw the reconfiguring of the master
bedroom including the addition of a walk-in closet
and an entirely new ensuite, complete with frameless
shower, air-bubble
tub and granite counter top.
|